Why us
The three things clients worry about
Will it overrun
The schedule goes into the contract and is tracked weekly. Over the past three years, ninety per cent of projects finished on time or early.
Will the price rise
Once the estimate is approved the price holds. Unless the client changes the design, we do not ask for more.
What about quality
Five-year warranty on structural work. Materials arrive with documentation and concealed works are signed off.
What we do
Our services
Industrial warehouses
Steel-frame warehouse buildings from 500 m² to 15,000 m².
450 ₼/m²-dən
Production facilities
Production buildings designed around the equipment that will go into them.
620 ₼/m²-dən
Cold storage
Temperature-controlled storage for the food and pharmaceutical industries.
780 ₼/m²-dən
Commercial buildings
Office centres, retail premises and car showrooms.
890 ₼/m²-dən
Design and engineering
Architectural and structural design, taken through state expert review.
Tikinti dəyərinin 4%-i
Construction supervision
Supervision on behalf of the client where another contractor is doing the work.
Razılaşma ilə
0
years in operation
0
completed facilities
0
thousand m² built
0
people on the team
About us
From three engineers to a team of forty
We began in 2009 with small contracting jobs. Our first large warehouse came in 2012 — 1,200 m² in Khirdalan.
Today we run four to six sites at once. Each project has its own engineering team and a single point of accountability.
Who we are
Leadership team
R. Quliyev
Founder, chief engineer
N. Əliyeva
Head of design
E. Məmmədov
Site operations director
A. Hüseynova
Estimating and procurement
Testimonials
What our clients say
They handed over our 6,000 m² warehouse in Sumgait in seven months; the contract said eight. A year on, the concrete floor still has no cracks.
F. S.
Logistics company, operations director
When building our cold store they knew the HACCP requirements better than we did. We changed the design twice and they did not ask for extra money.
L. R.
Food production company, founder
How is the price calculated?
How long does construction take?
Do you prepare the design, or do we need to bring one?
What are the payment terms?
Do you provide a warranty?
News
Latest updates
29.08.2026
A 6,000 m² warehouse handed over in Sumgait
The project finished a month ahead of the contract schedule.
13.08.2026
Steel frame or reinforced concrete? Choosing for warehouse builds
The two structural types compared on schedule, cost and operation.
27.07.2026
We have been certified to ISO 45001
Our occupational safety system passed international audit.
Companies we have built for
Have a project? The estimate is free
Tell us the area and intended use — we will come back with an initial figure within three working days.